A full gut transformation of a dead basement into a beautiful 2 bedroom unit

As part of Chicago's expanding ADU program, REBLD relocated mechanicals, created new masonry openings, and coordinated heavy excavation and structural upgrades in an occupied building to turn a dead basement into a habitable 8th unit with modern amenities.

The Project

The REBLD team excavated the basement to gain additional ceiling height, made structural upgrades that allowed the ADU common areas to be unobstructed, added windows, relocated the venting through occupied units above while adding in-unit laundry to for current tenants.

REBLD organized the trades efficiently and made the upgrades as seamlessly as possible with very little disruption to the existing tenants in the building - while also upgrading two vintage units along the way. A true value-add.


Unique aspects:

  • Turning a dead basement in to a modern 2BR/2BA unit

  • Bathroom/kitchen upgrades to existing units while saving original trim


Challenges:

  • Working around occupied conditions

  • Upgrading electric and water services at an occupied building

  • Relocating existing mechanics in an occupied building

Project Type

Full ADU build-out and 3 bathroom/kitchen upgrades

Location

Edgewater

Units

8

Duration

5 months

Cost

$375,000

See more of our work

A mixed-use redevelopment of the former Real World house

REBLD transformed the former MTV Real World House in Wicker Park into eight luxury rental apartments with a brand new commercial space at ground level.

Location

Wicker Park

Project Type

Mixed-use full gut

Duration

8 months

Project Image

A full-scale, seven-unit multifamily renovation driven by a strategic plan

REBLD walked the building and advised on the construction strategy and cost before the client made the investment. What followed was a strategic plan that aligned with leasing goals: for REBLD to deliver the first model unit by March 8. The result? All seven units rented by May 1 — at full asking price.

Location

East Andersonville

Project Type

Full gut with condo-quality finishes

Duration

7 Months

Ready to REBLD?